PROJECT NAME:
CLIENT:
ARCHITECT:
ENGINEER:
CONTRACT VALUE:
CONTRACT DURATION:
CATEGORY:
LOCATION:
Kerry Group Global Headquarters
Kerry Group
Michael Williams Associates Architect
Malachy Walsh & partners
€10,000,000
12 months
Commercial
Tralee, Co. Kerry
Kerry Group Headquarters is based in Tralee, Co. Kerry and employs over 24,000 people worldwide. The development involved the construction of substantial new build and major redevelopment consisting of a 3 storey entrance atrium, 2 storey canteen, 3 storey extension and complete internal refurbishment of Kerry Group Corporate Headquarters. The works were carried out in two distinct phases with a minimum amount of overlapping at interface works. Client operations had to be maintained for the duration of the works.
Kerry Group Global Headquarters
PROJECT NAME:
CLIENT:
ARCHITECT:
CONTRACT VALUE:
CONTRACT DURATION:
CATEGORY:
LOCATION:
Bus Éireann Depo Tralee, Co. Kerry
Bus Éireann / Department of Transport
Pascal & Watson
€1,800,000
10 Months
Commercial
Tralee Town Council
Bus Éireann depo in Tralee is a new state of the art fully accessible bus station in Tralee. The station which is 450m2 in size is adjacent to Tralee railway station enabling customers to make seamless transfers between bus and rail facilities, promoting the objective if integrated transport provision. Its contemporary design enhances the local urban environment and services for Bus Éireanns 1million customers in Kerry. The two storey triangular shaped building is striking in design and includes:
• A high specification to facilitate access between lower and upper levels
• A light filled and streamlined waiting areas for customers
• A customer travel center and booking office
As part of the development the existing bus depot was redesigned to provide 8 bus bays to facilitate for more coaches and customer service.
PROJECT NAME
CLIENT
ARCHITECT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Abbey Court Retail Development
Kelliher Property Holdings
Patrick A Cashman & Associates
MRG Consulting Engineers
€2,100,000
8 months
Commercial
Tralee Town Center, Tralee, Co. Kerry
Abbey Court retail units are a 1,500m2 development in Tralee Town Center. The project involved large scale demolition work in close proximity to extremely busy areas. Access to the site was restricted and a detailed traffic management plan was put in place. All deliveries were scheduled to opportune times and guided into site with the aid of trained spotters.
Substructure work involved extensive secant pilling and raft construction base. The superstructure consisted of steel portal frame and insitu concrete walls. The external of the units were clad in a limestone dura cladding with light being provided by large structural glazing units. The visual aspect of the site was maintained to the highest level due to its proximity to neighboring and operating retail units.
Abbey Court Retail Development
PROJECT NAME
CLIENT
ARCHITECT
ENGINEER
SERVICES ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Munster Council Headquarters
Munster GAA
Leyden Hasset & Associates
Leyden Hasset & Associates
Don O’Malley & Partners
€2,200,000
16 months
Commercial
Castletroy, Limerick
The Munster Council is a provincial council of the GAA. It represents over 500 community based GAA clubs and approximately 200,000 volunteer members. The development involved the construction of a new two storey split level structure comprising of 12,000 m2. The external envelope consists of fibrous cement rainscreen cladding and flush frameless glazing to the upper level resting on granite stone cladding to the lower level.
The project included new mechanical and electrical packages incorporating a number of sustainable energy features. Due to challenging ground conditions a mixture of piling and deep excavations were required for the foundations. New access roads, footpaths and 1,500m2 carpark were constructed as part of the development.
Munster Council Headquarters
PROJECT NAME
CLIENT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Dairygold Retail Store
Dairygold
Malachy Walsh & Partneres
€3,500,000
8 months
Commercial
Ballincollig, Co. Cork
Dairygold retail unit is a 2,300m2 two storey retail unit situated in Ballincollig, Co. Cork. The works involved 2 phases.
Phase 1
• Construct new concrete grain yard of 3,500m2 and retaining walls
• New weigh bridge and office areas
• Demolish existing mill
• Construct a temporary 750m2 store area
Dairygold continued to trade throughout phase 1 in the existing unit. A detailed traffic management plan was implemented to achieve this.
Phase 2
• Griffin Brothers handed over phase 1 to the client
• Construction of 2,300m2 retail unit
• Portal steel frame and insitu concrete construction
• New entrance layout
• Realignment of Grange Terrace road
• Demolition of existing shop unit
All works were carried within a live environment.
PROJECT NAME
CLIENT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Riverside House
P.S.C Accounting Services Ltd
O’Dowd Engineers
€2,500,000
10 Months
Commercial
Dan Spring Road, Tralee, Co. Kerry
Riverside House is a modern office building of 2,500m2 over three floors. Substructure works involved extensive precast piling and raft slab construction.
The superstructure of the building is R.C columns and beams with insitu R.C. floors. The external finishes are blockwork plastered including glazed curtain walling.
The interior fit out is to the highest of standards and incorporates raised access floors and demountable glazed office partitions in order for future office layout.
PROJECT NAME
CLIENT
ARCHITECT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Lidl Retail Development
Lidl Ireland
Lidl
Malachy Walsh & Partners
€2,300,000
4 months
Commercial
Tralee, Co. Kerry
Construction of a new retail unit and offices over 1,300m2 on a site over 5,000m2. The site required substantial fill with a depth of3m over the entire site area.
The building is largely of single storey steel frame construction, blockwork walls and concrete tile roof. The project was completed on time and on budget.
PROJECT NAME
CLIENT
ARCHITECT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
SIZE
LOCATION
Kerry County Council Office Suite
Kerry County Council
Brendan Williams & Associates
MRG Consulting Engineers
€3,000,000
12 months
Commercial
1,500m2
Tralee, Co. Kerry
Kerry County Council offices is a low energy building featuring a geothermal heat pump for space heating, solar collectors for hot water, natural ventilation, energy efficient lighting, an energy management system and highly insulated building fabric. The building is a 1,500m2 over 2 floors.
The main structure of the building is block construction with R.C columns and beams, insitu floors and structural steel for roof frame. Internal works included full office fit out, glazed partitions, raised access floors.
The project also included substantial mechanical and electrical and lift installation together with associated ground works to accommodate 5,100m of underground geothermal coil.
Kerry County Council Office Suite
PROJECT NAME
CLIENT
ARCHITECT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
O.P.W National Monument
O.P.W
O’Sullivan Campell Architects
M.R.G. Consulting Engineers
-----------------------------
12 months
Commercial
Killarney, Co. Kerry
Work on national monuments are operated on a site/project specific or geographical basis.
The country is divided into six regions. The bulk of the conservation and restoration work undertaken at national monuments in state care are carried out by direct labor force operational from the 6 regional depots.
The Killarney depot covers the South West region. This project involved the construction of large work shops, offices, garages, kitchens, canteen, storage areas and large external hardstandings including all landscaping with the Killarney National Park
PROJECT NAME
CLIENT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Kerry Agri Retail Store /Offices
Kerry Group
MRG Consulting Engineers
€2,750,000
8 months
Commercial
Tralee Road, Castleisland, Co. Kerry
Kerry Agri Store is situated on a prominent site adjacent to the N21 Tralee Castleisland road. The building is 1,600m2 of a retail store, warehouse and offices. The construction consisted of:
• 3,500 m2 bulk excavation
• 7,500 m2 bulk fill
• 5,500m3 concrete hardstandings
• 1,600m3 car park
• Culvert works adjacent to N21
• Complete building fir out
Kerry Agri Retail Store /Offices
PROJECT NAME
CLIENT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Gally’s Bar & Restaurant
Mr. Tim Galvin
James Fitzgerald Consulting Engineers
€2,000,000
8 Months
Commercial
Tralee, Co. Kerry
Gally’s Bar and Restaurant is a modern bright bar over two floors with four apartments on the 1st floor. The project consisted of:
• 4,300m3 bulk excavation
• 4,000m3 bulk fill
• R.C raft substructure
• Blockwork super structure and timber cut roof
• Internal bar fit out
• Mechanical & electrical installation s
• New 100 space car park
PROJECT NAME
CLIENT
PROJECT MANAGEMENT
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Garvey’s Supervalu Refurbishment
Garvey Group
Musgrave Group
--------------------
3 months
Commercial
Church Street, Castleisland, Co. Kerry
The project consisted of refurbishment and alteration works to Garvey’s Supervalu Castleisland.
It involved the installation of new mechanical and electrical elements, ceiling replacement, floor finishes, upgrade of WC facilities and decorations. Due to the requirement of maintaining a fully functional supermarket, the above works were carried out outside of normal working hours.
The works were completed swiftly, in an organized and safe manner without compromise to quality, hygiene, the supermarket or its staff and customers.
Garvey’s Supervalu Refurbishment
PROJECT NAME
CLIENT
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Boherbue Retail Store
Boherbue Co-Op
€3,800,000
11 Months
Commercial
Boherbue, Co. Cork
Boherbue retail store project is an extensive agri and retail complex in Boherbue Village. The project consisted of the construction of a prime retail site with multiple commercial units and hardstandings.
It involved the complete site clearance and demolition of existing buildings with a bulk excavation of 12,000m3. As this site was adjacent to the main secondary route R577 Cork Kerry road a comprehensive traffic management system was put in place. This was followed by the construction of a 3,000m2 building over 2 floors including full fit out.
As the client had its existing store in operation in close proximity, operations were maintained for the duration of the project.
PROJECT NAME
CLIENT
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
V.E.C Office
V.E.C
€350,000
3 months
Commercial
Riverside House, Dan Spring Rd., Tralee, Co. Kerry
The V.E.C. are located on the 1st and 2nd floors of Riverside House office building. The interior fit out is to the highest standards which incorporates raised floor access and demountable partitions. The fit out also consisted of full mechanical and electrical installations.