The Dunloe Hotel & Gardens
Killarney Hotels Ltd
Gottsteins Architects
Brunner Consulting Engineers
€600,000.00
4 months
Demolition
Dunloe hotel, Beaufort, Killarney, Co. Kerry
The project comprised of part demolition of a 7000m2 part demolition of the existing hotel to accommodate a new 20-million-euro redevelopment.
It involved stripping out finishes, taking out of building components, full M&E strip out, asbestos removal, contaminated waste removal, breaking down structure followed by enabling works such as secant pile wall to stabilise existing 4 storey structure, bulk excavation to a depth of 6 meters over entire demolition area, foul/ surface water drainage, electrical services, temporary weathering to exposed parts of retained buildings and installation of new fire tender access road.
The Dunloe Hotel & Gardens
PROJECT NAME
CLIENT
ARCHITECT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
SIZE
LOCATION
The project comprised of the enabling works as part of the development of a new education hub within the grounds of the University College Cork. The main elements of the works included extensive demolition and alteration works to the existing structures of the Windle building. The site was located in an extremely busy part of the campus heavily used by both pedestrians and vehicular traffic. As Griffin Brothers acted as P.S.C.S all movement of site related traffic was carefully supervised and managed. Construction vehicular access was only permitted when the UCC campus was closed which was between 23:00 and 07:00. The Windle Building is a protected structure and Griffin Brothers at all times provided adequate protection to avoid any damage to adjacent structures including the protected structure as well as measures to protect student, staff and members of the public on adjacent pubic routes
University College Cork Student Hub Enabling works
University College Cork
O’Donnell & Twomey Ltd
Horgan Lynch
€500,000.00
4 months
Demolition
University College Cork, College Road Co. Cork.
University College Cork Student Hub Enabling works
PROJECT NAME
CLIENT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Marina Park Demolition
Cork City Council
O’Connor, Sutton Cronin & Associates
O’Connor, Sutton Cronin & Associates
12 weeks
Demolition
Old Showgrounds, Marina Park, Monaghan Road, Cork
Griffin Brothers undertook the demolition, removal and disposal of the showground buildings, adjacent structures and specified hard and soft areas within the site.
The site environment consisted of a group of interconnected buildings. Griffin Brothers maintained a safe and controlled site with minimal environmental disturbance as the works.
Griffin Brothers at all times isolated construction areas while noise, vibration and dust generation were controlled to ensure construction workers and client employees were kept safe.
PROJECT NAME
CLIENT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Tralee Regeneration
Tralee Town Council
Tralee Town Council
€800,000
3 months
Demolition
Tralee, Co. Kerry
The project involved the demolition of 105 houses in Mitchel’s Crescent area of Tralee. The demolition was part of a 75 million euro regeneration project for Tralee.
The project involved large scale demolition work in close proximity to extremely busy areas. Access to the site was restricted by adequate security arrangements. The works involved a detailed investigation of all known services and a detailed investigation of the ground for unknown services.
All demolition material was crushed on site for reuse within the recommended environmental guidelines. Close cooperation was required with the community to mitigate against any adverse or unforeseen impacts. A detailed traffic management plan was enforced for the duration of the works along with a comprehensive site boundary fence line
PROJECT NAME
CLIENT
ARCHITECT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
SIZE
LOCATION
Fenit Port Development
Liebherr
Gottstein Architects
Brunner Consulting Engineers
--------------------------
3 months
Demolition
Fenit, Co. Kerry
Liebherr Crane Company exports to countries right around the globe from Fenit harbor. The company entered a 99 year lease with Fenit Harbour Commissioners.
The demolition project was formerly the Fenit Sea World Visitors Centre and this was being demolished to accommodate a multi-million euro industrial building. The scope of the works included, asbestos removal, diversion of existing port services, E.S.B substation demolition and the demolition of all structures on site.
All demolition material was crushed on site for re-use within the recommended environmental guidelines. Close co-operation was required with Fenit Port and Liebherr for the delivery of large crane components to Fenit Port. All works were carried out in a live port environment.
PROJECT NAME
CLIENT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Evaporator Project
Mondelez Ireland
Malachy Walsh & Partners
------------------
3 months
Demolition
Rathmore, Co. Kerry
This project was the demolition of a disused boiler building. This area of the factory is adjacent to the main operation with this remaining live and at full capacity for the entire project. The demolition involved the removal of a 2 storey concrete structure with a structural steel truss roof.
The building needed to be detached from two adjoining buildings with interlocking walls and roofs. Detailed monitoring of the adjacent buildings were maintained throughout the works. All newly exposed walls to existing adjoining buildings were addressed for dampness and water ingress. This work was undertaken in a live factory environment.
PROJECT NAME
CLIENT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Fitzgeralds Stadium
Kerry County Board
MRG Consulting Engineers
€250,000
6 weeks
Demolition
Killarney, Co. Kerry
Fitzgerald’s Stadium is located on Lewis Road in Killarney.
The project involved the demolition of the former dressing rooms to accommodate the construction of a new 5,000 spectator terrace other works included demolition of existing 4m high boundary walls to adjoining neighbors on Daltons Avenue, grub up existing hard standings, plant room demolitions including mechanical and electrical removal.
The stadium remained live during the execution of the contract and we took all necessary precautions to protect the staff and players from dust, excessive noise and other interference arising from the work.
.
PROJECT NAME
CLIENT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Demolition Moyderwell Secondary School
Tralee Town Council
Tralee Town Council
€350,000
3 months
Demolition
Tralee, Co. Kerry
The site at Moyderwell which housed the Mercy Convent and St. Marys Secondary School were part of the Mitchels Crescent 75 million euro regeneration project.
The location of the site was in the Town Center so an extensive traffic management design and implementation was carried out before and during the project.
The works included asbestos removal, contaminated substances removal, contaminated ground removal, mechanical and electrical decommissioning and removal of over 3,000m2 2 storey structure. All demolition material/concrete was crushed and screened on site for re-use within the recommended environmental guidelines.
Demolition Moyderwell Secondary School
PROJECT NAME
CLIENT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Warehouse/Commercial Building
Dairygold
Malachy Walsh & Partners
€275,000
2 months
Demolition
Ballincollig, Co. Cork
This project involved the demolition of 1700m2 warehouse/commercial building that consisted of a steel portal frame and R.C. walls and floors.
The demolition was to facilitate a new retail unit. Works also included asbestos removal and the grubbing up of 4,000m2 of concrete yards.
PROJECT NAME
CLIENT
ENGINEER
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Cheestring Factory Kerry Group
Kerry Group
MRG Consulting Engineers
-----------------------
3 months
Demolition
Charleville, Co. Cork
This project was within the Kerry Group Plant in Charleville. It involved the internal demolition of a 15 meter high R.C building including 3 R.C deck floors, columns, beam removal and large structural openings.
All temporary works design was carried out by Griffin Brothers. Due to the nature of this project it was critical to protect uphold and maintain all adjoining services encountered during the works. As this project was within a “live food production facility” we implemented a comprehensive dust and noise management plan.
Warehouse/Commercial Building
Cheestring Factory Kerry Group
PROJECT NAME
CLIENT
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Commercial Building
Kelliher Property Holdings
€230,000
2 months
Demolition
Town Center, Tralee, Co. Kerry
The property was a former car and tractor garage dating back to 1936 situated in Tralee Town Center, Denny Street, Tralee. Access to the site was restricted to a small arched entrance where the project was located in a narrow lane adjacent to the buildings along Denny Street.
The structure was a 4 storey stone building with an attached garage containing R.C. walls and steel truss roof. Adjoining the building on 2 elevations was a church that is in the record of protected structures. Temporary shoring and underpinning to the foundations of the existing church were carried out and full reinstatement to the surrounding area.
An extensive traffic management plan and temporary works plan was designed and implemented. Griffin Brothers worked closely with Tralee Town Council during the project.
PROJECT NAME
CLIENT
ARCHITECT
CONTRACT VALUE
CONTRACT DURATION
CATEGORY
LOCATION
Killarney Cinema Demolition
Cineplex
Tritschler Architects
€250,000
2 months
Demolition
Killarney, Co. Kerry
The project involved the demolition of the former Killarney cinema (Coopers), this was to accommodate the construction of a new five screen Cineplex.
The works involved large scale demolition over a 3,000m2 site in the heart of Killarney Town and in close proximity to extremely busy areas. All demolition waste was removed from site and the ground was reinstated to a safe manner
Killarney Cinema Demolition